logo

CT Resener I Biogas Power Plant

Sector: Biomass • Location: Argentina

Source: World Bank Group

Project
Active

The project entails the construction of a new 0.72MW biogas plant at at Villarina, Buenos Aires. Total investment stands at $ 2 million. Sponsors of the project is Resener SA (Inmade SA). The CT Resener I biogas plant will generate 0.72 MW of electricity from farming industry waste, such as onion harvest residues, discarded grains, fish remains, chicken litter and food remains. The contract was s

Status
Prospective
Sector
Biomass, Consumer Products, Manufacturing (Industrial), Power Generation (CCGT), Raw Materials, Government
Location
Argentina
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about CT Resener I Biogas Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “CT Resener I Biogas Power Plant” is an infrastructure initiative in the Biomass sector, located in Argentina. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the construction of a new 0.72MW biogas plant at at Villarina, Buenos Aires. Total investment stands at $ 2 million. Sponsors of the project is Resener SA (Inmade SA). The CT Resener I biogas plant will generate 0.72 MW of electricity from farming industry waste, such as onion harvest residues, discarded grains, fish remains, chicken litter and food remains. The contract was signed with CAMMESA under round 2 of RenovAr renewable energy programme. Financial close took place 12th July, 2018.

Original sector

Energy

Budget

Location

Country

Argentina

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Consumer Products, Manufacturing (Industrial), Power Generation (CCGT), Raw Materials, Government

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project