CTA Red Line Extension
Under construction · Illinois · Last reported Apr 2026
Source: Chicago YIMBY
The CTA Red Line Extension is a 5.6-mile-long transit project extending the existing Red Line from 95th Street in Roseland to 130th Street near Altgeld Gardens. It includes four new stations and a new train yard and maintenance facility near 120th Street. The project aims to connect multiple communities on the Far South Side to the rest of the transit system and stimulate local development.
- Status
- Under Construction
- Sector
- Rail, Road
- Location
- Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Chicago YIMBY
ConstructChat
Ask ConstructChat about CTA Red Line Extension
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The CTA Red Line Extension is a 5.6-mile-long transit project extending the existing Red Line from 95th Street in Roseland to 130th Street near Altgeld Gardens. It includes four new stations and a new train yard and maintenance facility near 120th Street. The project aims to connect multiple communities on the Far South Side to the rest of the transit system and stimulate local development. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Chicago YIMBY |
URL |
More Details
Record type | Project |
Sector | Rail, Road |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
