CTA
Active · Chile
Source: International Finance Corporation (IFC)
The proposed project consists of the construction and operation of 2x165MWe circulated fluidized bed (CFB) technology thermal power units in northern Chile to be fired by a combination of coal, petroleum coke, and biomass fuels. The project sponsor is Suez Energy Andino (project sponsor), a subsidiary of Suez S.A. (France). The first 165MWe unit (Unit 1) is to be developed by Central Termoeléctr
- Status
- Prospective
- Sector
- Oil and Gas, Power Transmission, Power Generation (CCGT), Metal, Geothermal, Government, Biomass
- Location
- Chile
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about CTA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project consists of the construction and operation of 2x165MWe circulated fluidized bed (CFB) technology thermal power units in northern Chile to be fired by a combination of coal, petroleum coke, and biomass fuels. The project sponsor is Suez Energy Andino (project sponsor), a subsidiary of Suez S.A. (France). The first 165MWe unit (Unit 1) is to be developed by Central Termoeléctrica Andina S.A., (CTA), while the second 165MWe unit (Unit 2), with essentially the same characteristics, will be developed through a separate special purpose company. Both Unit 1 and 2 will be selling power to the spot market. To hedge the exposure against spot market volatility, Unit 1 already signed a 21-year financial contract or power purchase agreement (PPA) with Corporación Nacional del Cobre S.A. (Codelco), a Chilean state-owned copper mining company, for 150 MW capacity sales. Furthermore, with respect to Units 1 and 2, CTA entered into a turn-key contract with Cobra Instalaciones y Servicios S.A. (Cobra), a company of ACS S.A. (Spain). Notice to proceed to the EPC contractor for the construction of the first unit (165 MW) was issued on July 1, 2007 and for the second unit on December 31, 2007. The construction period is expected to take 33 months. With respect to Unit 2, the PPA arrangements are yet to be finalized. |
Original sector | AA - Coal - Thermal Power Generation |
Location
Country | Chile |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Power Transmission, Power Generation (CCGT), Metal, Geothermal, Government, Biomass |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Oil and Gas projects in Chile
- El Romero Solar Plant Atacama
- Haru Oni project (phase 1)
- Energy efficiency and combined heat power in public hospitals (pilot project)
- Antofagasta Mining Energy Renewable
- Oil Basins Exploitation & Improvement Refineries
- Petroleum Refinery Concepcion
- National Public Account Forum: Promoting Transparency and Corporate Responsibility in the Mining Industry
- San Antonio International Terminal
