logo
ProjectPlanning Schematics

CT/DOT: CT 34 Stevenson Dam Bridge Replace

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

New bridge linking Monroe to Oxford about 250 feet upstream of the existing bridge (atop Stevenson Dam) - 55.5 foot span will include two 12-foot-wide travel lanes , two 8 foot wide road shoulders , and a 5 foot wide sidewalk on the upstream side of the bridge - New bridge will sit 15 feet higher above the river than the existing bridge - Construction will be complicated by PCB contamination in ri

Status
Prospective
Sector
Bridge, Car parking, Hydro, Road, Automotive, Commercial, Water Supply and Storage
Location
Monroe, Connecticut, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about CT/DOT: CT 34 Stevenson Dam Bridge Replace

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CT/DOT: CT 34 Stevenson Dam Bridge Replace” is an infrastructure initiative in the Bridge sector, located in Monroe, Connecticut, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

New bridge linking Monroe to Oxford about 250 feet upstream of the existing bridge (atop Stevenson Dam) - 55.5 foot span will include two 12-foot-wide travel lanes , two 8 foot wide road shoulders , and a 5 foot wide sidewalk on the upstream side of the bridge - New bridge will sit 15 feet higher above the river than the existing bridge - Construction will be complicated by PCB contamination in river sediment Replacement of Bridge 01843, Route 34 over Stevenson Dam and the Housatonic River in...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Connecticut

City

Monroe

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Bridge, Car parking, Hydro, Road, Automotive, Commercial, Water Supply and Storage

Article published date

2024-04-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project