CT/DOT: New Haven Line Signal Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Redesign the New Haven Line cab/no wayside signal system from CP229 Greenwich to CP243 Norwalk to support higher capacity. Higher capacity in this area will reduce the minimum supportable headway between trains and enhance reliability. Project Justification The existing Signal System on the New Haven Line between Norwalk and New Haven restricts service reliability and does not support minimum head
- Status
- Closed
- Sector
- Commercial, Rail, Road
- Location
- New Haven, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about CT/DOT: New Haven Line Signal Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Redesign the New Haven Line cab/no wayside signal system from CP229 Greenwich to CP243 Norwalk to support higher capacity. Higher capacity in this area will reduce the minimum supportable headway between trains and enhance reliability. Project Justification The existing Signal System on the New Haven Line between Norwalk and New Haven restricts service reliability and does not support minimum headways. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | New Haven |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Commercial, Rail, Road |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
