CT/DOT: Pavement Replacements
Planning schematics · Connecticut · Last reported Jul 2025
Source: Dodge
Reinstall main track 3 between Devon and Woodmont (CP266 to CP261), reconfigure Milford station platform. This project will restore the full four-track configuration of the New Haven Line, closing a 5-mile section that has only three mainline tracks. This will enable Amtrak to overtake Metro-North trains in both directions, improving operational flexibility for maintenance and increasing capacity
- Status
- Prospective
- Sector
- Road, Rail, Mass Transit, Manufacturing (Industrial), Commercial
- Location
- New Haven, Connecticut, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about CT/DOT: Pavement Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Reinstall main track 3 between Devon and Woodmont (CP266 to CP261), reconfigure Milford station platform. This project will restore the full four-track configuration of the New Haven Line, closing a 5-mile section that has only three mainline tracks. This will enable Amtrak to overtake Metro-North trains in both directions, improving operational flexibility for maintenance and increasing capacity and OT.. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | New Haven |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Rail, Mass Transit, Manufacturing (Industrial), Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- JASPER-DAHLONEGA ROAD
- MOULTRIE - SYLVESTER ROAD
