CT/DOT: Rte 82 Roundabout Improvements
Sector: Power Transmission • Location: Norwich, Connecticut, United States of America
Source: Dodge USA
State DOT to provide updates on six planned Route 82 roundabouts in Norwich. The plan calls for placing roundabouts at the intersections of New London Turnpike, Norman Road, Dunham Street, Osgood Street, Mount Pleasant Street and Asylum/Mechanic streets. Utility work for Phase 1 is planned to begin in late summer of 2024, King wrote, with roadway work to start in spring 2025 and the project to be
- Status
- Prospective
- Sector
- Power Transmission, Road, Mass Transit, Rail, Commercial, Power Generation (CCGT)
- Location
- Norwich, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CT/DOT: Rte 82 Roundabout Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | State DOT to provide updates on six planned Route 82 roundabouts in Norwich. The plan calls for placing roundabouts at the intersections of New London Turnpike, Norman Road, Dunham Street, Osgood Street, Mount Pleasant Street and Asylum/Mechanic streets. Utility work for Phase 1 is planned to begin in late summer of 2024, King wrote, with roadway work to start in spring 2025 and the project to be completed during the 2026 construction season. Phase 2 will run from Banas Court to Salem Plaza s... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Norwich |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Road, Mass Transit, Rail, Commercial, Power Generation (CCGT) |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
