logo
Project

Côte d’Ivoire - Azito Power Expansion Project - Phase III

Sector: Raw Materials • Location: Côte d'Ivoire

Source: African Development Bank (AfDB)

The project consists in the expansion of the Azito power plant in Côte d'Ivoire, by converting the existing simple-cycle power plant with 2 x 144 MW gas-fired turbines, to a combined-cycle power plant through the addition of two heat recovery steam generators, a 139 MW steam turbine generator, and all associated balance of plant. The Azito Energie power plant was commissioned in 2001 as a simple-c

Sector
Raw Materials, Water Supply and Storage, Power Generation (CCGT), Wind, Geothermal, Government
Location
Cote d'Ivoire
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Côte d’Ivoire - Azito Power Expansion Project - Phase III

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Côte d’Ivoire - Azito Power Expansion Project - Phase III” is an infrastructure initiative in the Raw Materials sector, located in Côte d'Ivoire. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project consists in the expansion of the Azito power plant in Côte d'Ivoire, by converting the existing simple-cycle power plant with 2 x 144 MW gas-fired turbines, to a combined-cycle power plant through the addition of two heat recovery steam generators, a 139 MW steam turbine generator, and all associated balance of plant. The Azito Energie power plant was commissioned in 2001 as a simple-cycle gas-fired power plant with output of 2 x 144 MW and an 18 km double circuit 225 kV transmission line. The Project should contribute to Côte d’Ivoire’s regaining its former role of a major regional power player. The total cost of the Azito expansion project is estimated at USD 430 million.

Original sector

Energy

Budget

Location

Country

Cote d'Ivoire

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Water Supply and Storage, Power Generation (CCGT), Wind, Geothermal, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project