logo

Côte d’Ivoire - CIPREL Power Expansion Project

Sector: Commercial • Location: Côte d'Ivoire

Source: African Development Bank (AfDB)

Project

The project concerns the fourth extension of a CIPREL power station. The project involves the design, construction and operation of a combined cycle turbine plant in Côte d'Ivoire. With the start of the economic recovery in Côte d'Ivoire and the related increase in electricity demand, the CIPREL (private electricity generation company in Côte d'Ivoire) undertook, at the request of the Ivorian gove

Project Information FAQ

Project Information

4 Q
The project “Côte d’Ivoire - CIPREL Power Expansion Project” is an infrastructure initiative in the Commercial sector, located in Côte d'Ivoire. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project concerns the fourth extension of a CIPREL power station. The project involves the design, construction and operation of a combined cycle turbine plant in Côte d'Ivoire. With the start of the economic recovery in Côte d'Ivoire and the related increase in electricity demand, the CIPREL (private electricity generation company in Côte d'Ivoire) undertook, at the request of the Ivorian government, studies to define the various scenarios available to increase the capacity of the CIPREL plant through the implementation of a combined cycle turbine. The project includes the implementation of an additional 111 MW TAG (Phase IV A) and a 111 MW TAV equipped with two heat recovery steam generators, and all the rest of the related equipment of the plant (phase IV B). The electricity generated by the new TAG as well as the TAV will be evacuated through the channel of two new bays that will be built at the existing Vridi 90/225 kV substation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data