Côte d’Ivoire - CIPREL Power Expansion Project
Sector: Commercial • Location: Côte d'Ivoire
Source: African Development Bank (AfDB)
The project concerns the fourth extension of a CIPREL power station. The project involves the design, construction and operation of a combined cycle turbine plant in Côte d'Ivoire. With the start of the economic recovery in Côte d'Ivoire and the related increase in electricity demand, the CIPREL (private electricity generation company in Côte d'Ivoire) undertook, at the request of the Ivorian gove
- Sector
- Commercial, Power Generation (CCGT), Wind, Government
- Location
- Cote d'Ivoire
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Côte d’Ivoire - CIPREL Power Expansion Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project concerns the fourth extension of a CIPREL power station. The project involves the design, construction and operation of a combined cycle turbine plant in Côte d'Ivoire. With the start of the economic recovery in Côte d'Ivoire and the related increase in electricity demand, the CIPREL (private electricity generation company in Côte d'Ivoire) undertook, at the request of the Ivorian government, studies to define the various scenarios available to increase the capacity of the CIPREL plant through the implementation of a combined cycle turbine. The project includes the implementation of an additional 111 MW TAG (Phase IV A) and a 111 MW TAV equipped with two heat recovery steam generators, and all the rest of the related equipment of the plant (phase IV B). The electricity generated by the new TAG as well as the TAV will be evacuated through the channel of two new bays that will be built at the existing Vridi 90/225 kV substation. |
Original sector | Energy |
Budget |
Location
Country | Cote d'Ivoire |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Wind, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Côte d'Ivoire
- Lagune Aghien Water Treatment Plant
- Compagnie Ivoirienne de Production d'Electricite (CIPREL)
- Cote d'Ivoire - Cocoa Pre-Export and Value Chain Trade Finance Support Facility -Sucres & Denrees (SUCDEN)
- Abidjan Lagoon Toll Bridge; HKB Bridge
- Biovea biomass plant
- Block CI 27 Expansion Program
- Azito Thermal Power Plant and Expansion
- Abidjan Port Expansion
