logo

Côte d’Ivoire - Gourou Integrated Watershed Management Project - Emergency Phase

Sector: Waste Processing and Treatment • Location: Côte d'Ivoire

Source: African Development Bank (AfDB)

Project

The Gourou Integrated Watershed Management Project involves implementing basin-wide strategic operations to ensure: (i) better regulation of drainage water toward the outlet, in particular at the level of the Indénié interchange; (ii) improved environmental management and treatment of solid waste; and (iii) preparation of a planning document on basin-wide integrated management. It was initiated be

Project Information FAQ

Project Information

4 Q
The project “Côte d’Ivoire - Gourou Integrated Watershed Management Project - Emergency Phase” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Côte d'Ivoire. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Gourou Integrated Watershed Management Project involves implementing basin-wide strategic operations to ensure: (i) better regulation of drainage water toward the outlet, in particular at the level of the Indénié interchange; (ii) improved environmental management and treatment of solid waste; and (iii) preparation of a planning document on basin-wide integrated management. It was initiated because of repeated flooding at the level of the intersection and its neighbouring areas, traffic hold-up at the Indénié interchange, the salinization of the Lagoon and an insalubrious environment. This project, which will help to improve access to and quality of basic social services as well as protect the environment – fits seamlessly into the Poverty Reduction Strategy Paper for 2009-2013. The project will consist of several phases. The first phase (“the Emergency Phase”) involves: (i) rehabilitating and constructing retarding basins, drainage channels and their connections to the main canal; and (ii) conducting a study to define the measures required to implement a sustainable sanitation and drainage strategy for the Basin. The project total cost is estimated at UA 23.30 million (excluding tax and duty).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data