logo
Project

Côte d’Ivoire - Gourou Integrated Watershed Management Project - Emergency Phase

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

The Gourou Integrated Watershed Management Project involves implementing basin-wide strategic operations to ensure: (i) better regulation of drainage water toward the outlet, in particular at the level of the Indénié interchange; (ii) improved environmental management and treatment of solid waste; and (iii) preparation of a planning document on basin-wide integrated management. It was initiated be

Sector
Waste Processing and Treatment, Water Supply and Storage, Biomass, Forest Products and Packaging, Government
Location
Cote d'Ivoire
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Côte d’Ivoire - Gourou Integrated Watershed Management Project - Emergency Phase

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Côte d’Ivoire - Gourou Integrated Watershed Management Project - Emergency Phase” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Côte d'Ivoire. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Gourou Integrated Watershed Management Project involves implementing basin-wide strategic operations to ensure: (i) better regulation of drainage water toward the outlet, in particular at the level of the Indénié interchange; (ii) improved environmental management and treatment of solid waste; and (iii) preparation of a planning document on basin-wide integrated management. It was initiated because of repeated flooding at the level of the intersection and its neighbouring areas, traffic hold-up at the Indénié interchange, the salinization of the Lagoon and an insalubrious environment. This project, which will help to improve access to and quality of basic social services as well as protect the environment – fits seamlessly into the Poverty Reduction Strategy Paper for 2009-2013. The project will consist of several phases. The first phase (“the Emergency Phase”) involves: (i) rehabilitating and constructing retarding basins, drainage channels and their connections to the main canal; and (ii) conducting a study to define the measures required to implement a sustainable sanitation and drainage strategy for the Basin. The project total cost is estimated at UA 23.30 million (excluding tax and duty).

Original sector

Water Supply & Sanitation

Budget

Location

Country

Cote d'Ivoire

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Biomass, Forest Products and Packaging, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project