Côte d’Ivoire - Gourou Integrated Watershed Management Project - Emergency Phase
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The Gourou Integrated Watershed Management Project involves implementing basin-wide strategic operations to ensure: (i) better regulation of drainage water toward the outlet, in particular at the level of the Indénié interchange; (ii) improved environmental management and treatment of solid waste; and (iii) preparation of a planning document on basin-wide integrated management. It was initiated be
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Biomass, Forest Products and Packaging, Government
- Location
- Cote d'Ivoire
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Côte d’Ivoire - Gourou Integrated Watershed Management Project - Emergency Phase
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Gourou Integrated Watershed Management Project involves implementing basin-wide strategic operations to ensure: (i) better regulation of drainage water toward the outlet, in particular at the level of the Indénié interchange; (ii) improved environmental management and treatment of solid waste; and (iii) preparation of a planning document on basin-wide integrated management. It was initiated because of repeated flooding at the level of the intersection and its neighbouring areas, traffic hold-up at the Indénié interchange, the salinization of the Lagoon and an insalubrious environment. This project, which will help to improve access to and quality of basic social services as well as protect the environment – fits seamlessly into the Poverty Reduction Strategy Paper for 2009-2013. The project will consist of several phases. The first phase (“the Emergency Phase”) involves: (i) rehabilitating and constructing retarding basins, drainage channels and their connections to the main canal; and (ii) conducting a study to define the measures required to implement a sustainable sanitation and drainage strategy for the Basin. The project total cost is estimated at UA 23.30 million (excluding tax and duty). |
Original sector | Water Supply & Sanitation |
Budget |
Location
Country | Cote d'Ivoire |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Biomass, Forest Products and Packaging, Government |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Côte d'Ivoire
- Lagune Aghien Water Treatment Plant
- Block CI 27 Expansion Program
- RESEAU ASSAINISSEMENT EAUX USEES ABIDJ
- AEP ABIDJAN
- ADDUCTION D'EAU KORHOGO
- The Azito Power Plant Add-on Project
- Societe Distribution d'Eau de Cote d'Ivoire (SODECI) Lease Renewal
- Côte d'Ivoire: Inclusive Connectivity and Rural Infrastructure Project
