Côte d’Ivoire - Gourou Integrated Watershed Management Project - Emergency Phase
Sector: Waste Processing and Treatment • Location: Côte d'Ivoire
Source: African Development Bank (AfDB)
The Gourou Integrated Watershed Management Project involves implementing basin-wide strategic operations to ensure: (i) better regulation of drainage water toward the outlet, in particular at the level of the Indénié interchange; (ii) improved environmental management and treatment of solid waste; and (iii) preparation of a planning document on basin-wide integrated management. It was initiated be
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Gourou Integrated Watershed Management Project involves implementing basin-wide strategic operations to ensure: (i) better regulation of drainage water toward the outlet, in particular at the level of the Indénié interchange; (ii) improved environmental management and treatment of solid waste; and (iii) preparation of a planning document on basin-wide integrated management. It was initiated because of repeated flooding at the level of the intersection and its neighbouring areas, traffic hold-up at the Indénié interchange, the salinization of the Lagoon and an insalubrious environment. This project, which will help to improve access to and quality of basic social services as well as protect the environment – fits seamlessly into the Poverty Reduction Strategy Paper for 2009-2013. The project will consist of several phases. The first phase (“the Emergency Phase”) involves: (i) rehabilitating and constructing retarding basins, drainage channels and their connections to the main canal; and (ii) conducting a study to define the measures required to implement a sustainable sanitation and drainage strategy for the Basin. The project total cost is estimated at UA 23.30 million (excluding tax and duty). |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
