logo
Project

Côte d’Ivoire - Henri Konan Bédié Toll Bridge Project

Sector: Residential • Location: Côte d'Ivoire

Source: African Development Bank (AfDB)

The project of construction of the Riviera - Marcory bridge and access roads was initiated by the Ivorian State because of the need to guarantee the fluidity of urban traffic in the city of Abidjan. The link between Riviera and Marcory , better known as the "Third Bridge", is an urban expressway linking the towns of Cocody and Marcory by a bridge over the Ebrié Lagoon. The project has 2 x 2 lanes

Sector
Residential, Commercial, Bridge, Mass Transit, Road, Government
Location
Cote d'Ivoire
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Côte d’Ivoire - Henri Konan Bédié Toll Bridge Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Côte d’Ivoire - Henri Konan Bédié Toll Bridge Project” is an infrastructure initiative in the Residential sector, located in Côte d'Ivoire. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project of construction of the Riviera - Marcory bridge and access roads was initiated by the Ivorian State because of the need to guarantee the fluidity of urban traffic in the city of Abidjan. The link between Riviera and Marcory , better known as the "Third Bridge", is an urban expressway linking the towns of Cocody and Marcory by a bridge over the Ebrié Lagoon. The project has 2 x 2 lanes in the northern part of the Boulevard François Mitterrand at the toll station, then 2 x 3 lanes on the viaduct and in the southern part (Marcory). Its total length is 6,600 meters broken down as follows: 1st Section (Bd Mitterrand - Toll booth: 2,600 m); 2nd Section (Toll booth - INJS (viaduct): 400 m dike and 1,500 m viaduct); 3rd Section (INJS - Bd VGE (Marcory): 2,100 m). The third bridge will provide significant gains in distance and time on the north-south routes, with positive skills on the economy in general and on the environment, including air pollution by limiting distances traveled and traffic jams. https://vimeo.com/201839640#at=26

Original sector

Transport & Storage

Budget

Location

Country

Cote d'Ivoire

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Residential, Commercial, Bridge, Mass Transit, Road, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project