Côte d’Ivoire - Power Transmission and Distribution Networks Reinforcement Project
The status, timeline and source of this project. A free account opens every field.
Source: African Development Bank (AfDB)
The present project addresses the sector’s main problems, namely the dilapidated state and saturation of the networks, which affects the electricity sub-sector’s performance and are the causes of the suspension of new connections of industrial and household customers in certain regions, especially in the West of the country. Therefore, the project’s implementation will result in the launching of i
- Sector
- Geothermal, Government, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Metal
- Location
- Cote d'Ivoire
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Côte d’Ivoire - Power Transmission and Distribution Networks Reinforcement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The present project addresses the sector’s main problems, namely the dilapidated state and saturation of the networks, which affects the electricity sub-sector’s performance and are the causes of the suspension of new connections of industrial and household customers in certain regions, especially in the West of the country. Therefore, the project’s implementation will result in the launching of industrial and mining projects such as those related to the Feketero, Ouélé and Mahapleu gold mines, the Touleupleu iron ore mines, the Sampleu nickel mines and the San Pedro iron ore and manganese plant. The total estimated capacity of these projects by 2018 is 70 MW. The project will also allow wood processing industries in Montagnes District, currently using their own energy sources (diesel generators with a total capacity of 3.3 MW) to make significant savings as a result of their connection to the grid, the cost of which is CFAF 77 per kWh compared to CFAF 117 for the generators, i.e. a 34% saving. As a result of the project, Compagnie Ivoirienne d’Electricité (CIE) (the power utility company) will close down eight isolated thermal plants operating in Montagnes District (in Tinhou, Diboke, Medibli, Taï, Sakre, Zeregbo, Koreahinou and Ouallo-Kouloukoro localities). The total project cost is EUR 162.14 million. The project comprises three components, namely: 1) infrastructure; 2) project management; and 3) environmental and social mitigation. |
Original sector | Energy |
Budget |
Location
Country | Cote d'Ivoire |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Geothermal, Government, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Metal |
Article published date | 2026-03-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Geothermal projects in Côte d'Ivoire
- Azito Energie SA
- Azito Thermal Power Plant and Expansion
- Azito Power Project Phase I-III
- Azito Gas-Fired Power Plant Phase IV
- Côte d’Ivoire - Azito Power Expansion Project - Phase III
- Côte d'Ivoire - 44 MW Singrobo - Ahouaty Hydropower Project
- Cote d'Ivoire - Atinkou (CIPREL V) 390 MW Gas Power Project
- Orange Village / Koffi & Diabaté Architectes