logo
Project

Côte d’Ivoire - Power Transmission and Distribution Networks Reinforcement Project

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

The present project addresses the sector’s main problems, namely the dilapidated state and saturation of the networks, which affects the electricity sub-sector’s performance and are the causes of the suspension of new connections of industrial and household customers in certain regions, especially in the West of the country. Therefore, the project’s implementation will result in the launching of i

Sector
Geothermal, Government, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Metal
Location
Cote d'Ivoire
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Côte d’Ivoire - Power Transmission and Distribution Networks Reinforcement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Côte d’Ivoire - Power Transmission and Distribution Networks Reinforcement Project” is an infrastructure initiative in the Geothermal sector, located in Côte d'Ivoire. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The present project addresses the sector’s main problems, namely the dilapidated state and saturation of the networks, which affects the electricity sub-sector’s performance and are the causes of the suspension of new connections of industrial and household customers in certain regions, especially in the West of the country. Therefore, the project’s implementation will result in the launching of industrial and mining projects such as those related to the Feketero, Ouélé and Mahapleu gold mines, the Touleupleu iron ore mines, the Sampleu nickel mines and the San Pedro iron ore and manganese plant. The total estimated capacity of these projects by 2018 is 70 MW. The project will also allow wood processing industries in Montagnes District, currently using their own energy sources (diesel generators with a total capacity of 3.3 MW) to make significant savings as a result of their connection to the grid, the cost of which is CFAF 77 per kWh compared to CFAF 117 for the generators, i.e. a 34% saving. As a result of the project, Compagnie Ivoirienne d’Electricité (CIE) (the power utility company) will close down eight isolated thermal plants operating in Montagnes District (in Tinhou, Diboke, Medibli, Taï, Sakre, Zeregbo, Koreahinou and Ouallo-Kouloukoro localities). The total project cost is EUR 162.14 million. The project comprises three components, namely: 1) infrastructure; 2) project management; and 3) environmental and social mitigation.

Original sector

Energy

Budget

Location

Country

Cote d'Ivoire

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Geothermal, Government, Power Transmission, Manufacturing (Industrial), Power Generation (CCGT), Metal

Article published date

2026-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project