Côte d'Ivoire -Liberia Interconnection PPP project
One of 2 projects Taiyo tracks in Cote d'Ivoire, Liberia.
Source: InfraPPPWorld
The project involves the development of 650 km of 225 kV transmission line starting from Buchanan, Liberia to San Pedro, Ivory Coast. The transmission line aims to link the power systems of Côte d'Ivoire and Liberia, which will create more direct access to the clean energy generation resources in both countries and will increase the reliability and stability of power exchanges between Côte d'Ivoir
- Status
- Prospective
- Sector
- Power Generation (CCGT)
- Location
- Cote d'Ivoire
- Updated
- 19 Nov 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Côte d'Ivoire -Liberia Interconnection PPP project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | project in planning |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project involves the development of 650 km of 225 kV transmission line starting from Buchanan, Liberia to San Pedro, Ivory Coast. The transmission line aims to link the power systems of Côte d'Ivoire and Liberia, which will create more direct access to the clean energy generation resources in both countries and will increase the reliability and stability of power exchanges between Côte d'Ivoire and Liberia. |
Original sector | Energy |
Procurement method |
Location
Country | Cote d'Ivoire |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
