CTH F - Busse Road Improvements
Sector: Automotive • Location: Waukesha, Wisconsin, United States of America
Source: Dodge
The purpose of this project is to improve the traffic signal equipment and geometry of the intersection of CTH F (Redford Boulevard) and Busse Road. Changes to the existing CTH F and Busse Road intersection will provide safer traffic signal control, reduce collisions, and improve visibility for turning vehicles. Improvements include: Realign CTH F left turn lanes to improve visibility of opposing
- Status
- Prospective
- Sector
- Automotive, Government, Road, Commercial
- Location
- Waukesha, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about CTH F - Busse Road Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of this project is to improve the traffic signal equipment and geometry of the intersection of CTH F (Redford Boulevard) and Busse Road. Changes to the existing CTH F and Busse Road intersection will provide safer traffic signal control, reduce collisions, and improve visibility for turning vehicles. Improvements include: Realign CTH F left turn lanes to improve visibility of opposing traffic. Replace all existing traffic signal equipment, installing monotubes and adding retrorefl... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Waukesha |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Automotive, Government, Road, Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- MARTA INTELLIGENT TRANSPORTATION SYSTEM (FLEET AVLS)/DEKALB
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
