CTK Parking Lot Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
PROJECT DESCRIPTION / SCOPE OF WORK: Christ the King Catholic School, 227 Thomas Avenue, Wallaceburg, ON N8A 2B9 As described in the Drawings and Specifications, the work includes demolition of some existing hard surface site conditions, concrete, and asphalt. New work includes a new parking lot arrangement that required new concrete work, curbing, and asphalt paving. Landscaping, new site appurte
- Status
- Closed
- Sector
- Commercial, Cement, Road, Car parking, Automotive
- Location
- St Clair Township, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CTK Parking Lot Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | PROJECT DESCRIPTION / SCOPE OF WORK: Christ the King Catholic School, 227 Thomas Avenue, Wallaceburg, ON N8A 2B9 As described in the Drawings and Specifications, the work includes demolition of some existing hard surface site conditions, concrete, and asphalt. New work includes a new parking lot arrangement that required new concrete work, curbing, and asphalt paving. Landscaping, new site appurtences and relocation of identified site appurtances will also be required. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | St Clair Township |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Cement, Road, Car parking, Automotive |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
