logo
ProjectActive

CTT

One of 3,042 projects Taiyo tracks in Mozambique.

Source: International Finance Corporation (IFC)

The proposed project consist of the construction and operation of a ~420MW natural gas power plant (Combined Cycle Gas Turbine) power plant which will draw gas from Sasol reservoirs via planned Sasol gas processing infrastructure, located in the vicinity  of an existing Sasol Central Processing Facility (CPF). The preferred project location is ca. 500 m south of the CPF. The CPF, and the proposed

Status
Prospective
Sector
Road, Wind, Geothermal, Natural Gas, Government, Power Generation (CCGT)
Location
Mozambique
Updated
19 Nov 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about CTT

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “CTT” is an infrastructure initiative in the Road sector, located in Mozambique. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The proposed project consist of the construction and operation of a ~420MW natural gas power plant (Combined Cycle Gas Turbine) power plant which will draw gas from Sasol reservoirs via planned Sasol gas processing infrastructure, located in the vicinity  of an existing Sasol Central Processing Facility (CPF). The preferred project location is ca. 500 m south of the CPF. The CPF, and the proposed project site is located in the Temane/ Mangugumete area, Inhambane Province, ca. 40 km northwest of the town of Vilanculos. The Govuro River lies 8 km east of the proposed CCGT site. The estimated footprint of the CCGT power plant is ca. 20 ha.The Project involves the construction of a 25 km 400 kV electrical transmission line to connect the power plant to a new Vilanculos substation, which is being developed as part of the ~563 km 400 kV Temane Transmission Project (TTP) connecting Vilanculos to Maputo. Additional associated infrastructure and project facilities may include: a) gas pipeline from the CPF to the power plant and b) access road, construction camp and contractor laydown areas.

Original sector

V-AB - Gas - Thermal Power Generation

Location

Country

Mozambique

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Road, Wind, Geothermal, Natural Gas, Government, Power Generation (CCGT)

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project