CTT
One of 3,042 projects Taiyo tracks in Mozambique.
Source: International Finance Corporation (IFC)
The proposed project consist of the construction and operation of a ~420MW natural gas power plant (Combined Cycle Gas Turbine) power plant which will draw gas from Sasol reservoirs via planned Sasol gas processing infrastructure, located in the vicinity of an existing Sasol Central Processing Facility (CPF). The preferred project location is ca. 500 m south of the CPF. The CPF, and the proposed
- Status
- Prospective
- Sector
- Road, Wind, Geothermal, Natural Gas, Government, Power Generation (CCGT)
- Location
- Mozambique
- Updated
- 19 Nov 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about CTT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The proposed project consist of the construction and operation of a ~420MW natural gas power plant (Combined Cycle Gas Turbine) power plant which will draw gas from Sasol reservoirs via planned Sasol gas processing infrastructure, located in the vicinity of an existing Sasol Central Processing Facility (CPF). The preferred project location is ca. 500 m south of the CPF. The CPF, and the proposed project site is located in the Temane/ Mangugumete area, Inhambane Province, ca. 40 km northwest of the town of Vilanculos. The Govuro River lies 8 km east of the proposed CCGT site. The estimated footprint of the CCGT power plant is ca. 20 ha.The Project involves the construction of a 25 km 400 kV electrical transmission line to connect the power plant to a new Vilanculos substation, which is being developed as part of the ~563 km 400 kV Temane Transmission Project (TTP) connecting Vilanculos to Maputo. Additional associated infrastructure and project facilities may include: a) gas pipeline from the CPF to the power plant and b) access road, construction camp and contractor laydown areas. |
Original sector | V-AB - Gas - Thermal Power Generation |
Location
Country | Mozambique |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Road, Wind, Geothermal, Natural Gas, Government, Power Generation (CCGT) |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Mozambique
- Mozambique - Supplementary Loan to Montepuez - Lichinga Road Project
- MOZAL S.A.R.L.
- Maputo Port
- BEIRA CORRIDOR PROJECT
- Corredor de Desenvolvimento do Norte
- Mozambique LNG Park, Cabo Delgaro Province
- Mozambique - The Pemba-Lichinga Integrated Development Corridor Special Agro-Industrial Processing Zone (SAPZ) Project -Phase I
- Mozambique - Massingir Dam and Smallholder Agriculture Rehabilitation Project
