logo

CTT

Sector: Road • Location: Mozambique

Source: International Finance Corporation (IFC)

Project
Active

The proposed project consist of the construction and operation of a ~420MW natural gas power plant (Combined Cycle Gas Turbine) power plant which will draw gas from Sasol reservoirs via planned Sasol gas processing infrastructure, located in the vicinity  of an existing Sasol Central Processing Facility (CPF). The preferred project location is ca. 500 m south of the CPF. The CPF, and the proposed

Project Information FAQ

Project Information

4 Q
The project “CTT” is an infrastructure initiative in the Road sector, located in Mozambique. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed project consist of the construction and operation of a ~420MW natural gas power plant (Combined Cycle Gas Turbine) power plant which will draw gas from Sasol reservoirs via planned Sasol gas processing infrastructure, located in the vicinity  of an existing Sasol Central Processing Facility (CPF). The preferred project location is ca. 500 m south of the CPF. The CPF, and the proposed project site is located in the Temane/ Mangugumete area, Inhambane Province, ca. 40 km northwest of the town of Vilanculos. The Govuro River lies 8 km east of the proposed CCGT site. The estimated footprint of the CCGT power plant is ca. 20 ha.The Project involves the construction of a 25 km 400 kV electrical transmission line to connect the power plant to a new Vilanculos substation, which is being developed as part of the ~563 km 400 kV Temane Transmission Project (TTP) connecting Vilanculos to Maputo. Additional associated infrastructure and project facilities may include: a) gas pipeline from the CPF to the power plant and b) access road, construction camp and contractor laydown areas.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data