CU Boulder East Campus Solar Array
Sector: Power Generation (CCGT) • Location: Boulder, Colorado, United States
Source: Daily Camera
A 1.1-megawatt ground-mounted solar array on a 2-acre site east of Lot 560 on East Campus at the University of Colorado Boulder. The solar array generates about 1.4 million kilowatt hours of electricity annually, offsetting roughly 1% of CU Boulder's total electricity use and saving an estimated $120,000 annually in energy costs. The project was approved in June 2024 and construction began in Apri
- Status
- Closed
- Sector
- Power Generation (CCGT), Solar, Education
- Location
- Boulder, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Daily Camera
ConstructChat
Ask ConstructChat about CU Boulder East Campus Solar Array
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 1.1-megawatt ground-mounted solar array on a 2-acre site east of Lot 560 on East Campus at the University of Colorado Boulder. The solar array generates about 1.4 million kilowatt hours of electricity annually, offsetting roughly 1% of CU Boulder's total electricity use and saving an estimated $120,000 annually in energy costs. The project was approved in June 2024 and construction began in April 2025. |
Original sector | Energy |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Boulder |
Source
Source | Daily Camera |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Solar, Education |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States
- Fort Hood Military Base, Texas
- Grand Forks Air Force Base, North Dakota
- Kings Bay Naval Submarine Base
- Beaumont Refinery Expansion, Texas
- Dakota Prairie Refinery, Stark County, North Dakota
- Monkey Island LNG Terminal, Louisiana
- Midcontinent Express Pipeline (MEP), Oklahoma
- Jacksonville LNG Project, Jacksonville, Florida
