CU Williams Village Post Consumer Waste System
Closed · Colorado · Last reported Oct 2024
Source: Dodge USA
The project goal in the Village Center Dining is to upgrade the existing bio-digester waste management system to a pulper waste management system including all electrical mechanical and architectural upgrades associated with
- Status
- Closed
- Sector
- Power Generation (CCGT), Waste Processing and Treatment, Commercial, Raw Materials, Consumer Products
- Location
- Boulder, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about CU Williams Village Post Consumer Waste System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project goal in the Village Center Dining is to upgrade the existing bio-digester waste management system to a pulper waste management system including all electrical mechanical and architectural upgrades associated with |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Boulder |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Waste Processing and Treatment, Commercial, Raw Materials, Consumer Products |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
