logo

Cuauhtémoc Park Ramp / Carreño Sartori Arquitectos

Sector: Road

Source: ArchDaily

Project
Closed

Construction, Modulation, disassembly, and assembly. The torsion of the ascending spiral is resolved in a concentric digital model formed by radial ribs and a central beam, understood as a set of solidary elements. This model unfolds into flat figures of the different pieces, which are cut with CNC on large format sheets of 3000x9000 mm. In turn, these elements - which include semi-cuts for welded

Project Information FAQ

Project Information

3 Q
The project “Cuauhtémoc Park Ramp / Carreño Sartori Arquitectos” is an infrastructure initiative in the Road sector. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Construction, Modulation, disassembly, and assembly. The torsion of the ascending spiral is resolved in a concentric digital model formed by radial ribs and a central beam, understood as a set of solidary elements. This model unfolds into flat figures of the different pieces, which are cut with CNC on large format sheets of 3000x9000 mm. In turn, these elements - which include semi-cuts for welded joints - are rolled for curvatures and assembled in the factory in nine equal modules plus three adjustment modules for the ends. Then, these prefabricated components are mounted on the in-situ pillars. The shims, both for the terrain slopes and for the construction elements, were tested in different physical scale models, which anticipated the work.The growth of the avenue has compressed the original pedestrian descent and brought the cars closer to the park with great risk - and noise.The second section - also 60 meters long - is a tree-lined slope, which serves as a containment for cars and noise. Between both sections, there is a staircase for quick passage and a small amphitheater.Text description provided by the architects.Rampa Cuauhtemoc. It is an open competition to solve the universal accessibility of a route that continues a system of public parks.It is necessary to overcome 6 meters of unevenness with a constant slope of 5%, which requires an extension of 120 meters for the ramp. Taking advantage of the long circular perimeter of the pool, it is surrounded by a first 60-meter-long elevated walkway that descends with views of the surrounding mountains.In the place, there is a bridge that crosses the highway and a circular pool from the 70s, a project by Carlos Martner, an outstanding Chilean landscape architect.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data