The Cubico Alten Aguascalientes Solar PV Project (the “Project”) includes the construction and operation of two adjacent greenfield photovoltaic (“PV”) power plants, Solem 1 and Solem 2, with total installed capacity of 348MWp (290MW), three electrical substations (two step-up substations and one maneuver substation), and a 6.6 km power transmission line connecting the substations to the national

Status
Prospective
Sector
Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Road, Solar, Water Supply and Storage, Government
Location
Mexico
Updated
22 Jul 2026
Source
International Finance Corporation (IFC)

ConstructChat

Ask ConstructChat about Cubico Alten Aguascalientes Solar PV Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Cubico Alten Aguascalientes Solar PV Project” is an infrastructure initiative in the Waste Processing and Treatment sector, located in Mexico. Taiyo aggregates data on it from International Finance Corporation (IFC).

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Cubico Alten Aguascalientes Solar PV Project (the “Project”) includes the construction and operation of two adjacent greenfield photovoltaic (“PV”) power plants, Solem 1 and Solem 2, with total installed capacity of 348MWp (290MW), three electrical substations (two step-up substations and one maneuver substation), and a 6.6 km power transmission line connecting the substations to the national grid.  The maneuver substation will later be handed over to the state-owned power utility, Comisión Federal de Electricidad (“CFE”).  The project will be installed on 15 privately owned and leased lots within a total area of 963.7 hectares, located in the El Llano municipality of Aguascalientes, Mexico.Aguascalientes has a semi-arid climate, and most of El Llano is rural and sparsely populated. Some 1,200 people live in the surrounding communities within a 4 km radius of the Project site.  Most have access to basic services such as roads and electricity but not sewer systems. The site is easily accessible by existing highways and municipal roads.  The total project cost is estimated at US$311 million.  IFC is considering providing loans for up to US$70 million to support the construction of the Project.Both plants will use crystalline silicone panels, supplied by top-tier module manufacturers, mounted on single axis horizontal tracking systems.    The sponsors of the Project are Cubico Sustainable Investments (“Cubico”), a global renewable energy investor, and Alten RE Developments America, B.V. (“Alten”), the subsidiary of Alten Renewable Energy Developments B.V., a solar PV developer incorporated in the Netherlands. The Alten group of companies owns and operates 6 solar PV plants in Spain. The Project will be constructed and operated by the Mexican subsidiary of Grupo Ortiz, a Spanish family-owned construction company.  Alten is an existing IFC client, jointly developing a 120MW Solar PV project in Kogi State of Nigeria (see project #36761 InfraV-MBSO disclosure published December 14, 2015).  Grupo Ortiz will also manage operations and maintenance of the plants.Both Solem 1 and Solem 2 were awarded long term power, clean energy certificates and capacity purchase agreements (“PPAs”) in Mexico’s most recent energy auction, which took place in September 2016.  Following the construction period for both projects, Solem 1 is expected to be commissioned by September 2018 and Solem 2 by June 2019. A subsidiary of CFE will act as off-taker of the Project and counterparty to three separate PPAs for each of Solem 1 and Solem 2: i) a 15-year term for energy sales (MWh); ii) a 20-year term for clean energy certificate (“CELs”) sales; and iii) a 15-year term for capacity (MW).  Once constructed, the Project will be one of the largest solar PV plants in Latin America.

Original sector

V-BF - Solar - Renewable Energy Generation

Location

Country

Mexico

Source

Source

International Finance Corporation (IFC)

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Power Transmission, Power Generation (CCGT), Road, Solar, Water Supply and Storage, Government

Article published date

2025-08-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project