Cuiaba – Itumbiara Transmission Line
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
In October 2004, the Agencia Nacional de Energia Electrica (ANEEL –Brazil’s energy regulatory agency) awarded a 30 year contract to build, operate and maintain an 811 km transmission line of 500 kV and two power substations between Cuiaba in Mato Grasso and Intumbiara in Minas Gerais to the Spanish firm Elecnor. Elecnor won the bid in an auction in September 2004 by offering 40% below the maximum
- Status
- Prospective
- Sector
- Commercial, Government, Power Generation (CCGT)
- Location
- Asti, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Cuiaba – Itumbiara Transmission Line
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In October 2004, the Agencia Nacional de Energia Electrica (ANEEL –Brazil’s energy regulatory agency) awarded a 30 year contract to build, operate and maintain an 811 km transmission line of 500 kV and two power substations between Cuiaba in Mato Grasso and Intumbiara in Minas Gerais to the Spanish firm Elecnor. Elecnor won the bid in an auction in September 2004 by offering 40% below the maximum annual revenues. It offered to pay US$59.3 million (164.6 million real) to the Brazilian government for the concession. In December 2006, BNDES, the Brazilian development bank, financed US $224 million for the construction, operation and maintenance of the transmission line. Total investment requirements were estimated at US$361 million (788 million real). Indirect financing was provided by three different groups of private banks (Banco Bradesco SA, Banco Votorantim SA, Banco Santander Brasil SA and Banco BNP Paribas Brasil SA). At this time, BNDES also financed #4352 Vila Do Conde Transmissora de Energia Transmission Line and #4353 Porto Primavera - Dourados – Imbirissu. MIGA also issued guarantees of $35.4 million to Cobra Instalaciones y Servicios SA. (Cobra) of Spain to cover its $39.2 million equity. The coverage is for fifteen years against the risk of breach of contract, and up to 10 years against the risk of transfer restriction. In March 2010, the shareholding structure was again modified when a Chinese state – owned company, SGID, acquired Itumbiara Transmissora de Energia and other transmission projects from Plena Transmissora de Energia (Isolux, 33,3%; Elecnor, 33,3%; Cobra Instalaciones y Servicios, 33,3%), which held 100% of the shares of the project company at the time the transaction took place. SGID invested US$ 1.72 billion (BRL 3.1 billion) in the acquisition of Plena Transmissora de Energia. |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Brazil |
State | Asti |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Government, Power Generation (CCGT) |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
