Cuiaba – Itumbiara Transmission Line

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

In October 2004, the Agencia Nacional de Energia Electrica (ANEEL –Brazil’s energy regulatory agency) awarded a 30 year contract to build, operate and maintain an 811 km transmission line of 500 kV and two power substations between Cuiaba in Mato Grasso and Intumbiara in Minas Gerais to the Spanish firm Elecnor. Elecnor won the bid in an auction in September 2004 by offering 40% below the maximum

Status
Prospective
Sector
Commercial, Government, Power Generation (CCGT)
Location
Asti, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Cuiaba – Itumbiara Transmission Line

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Cuiaba – Itumbiara Transmission Line” is an infrastructure initiative in the Commercial sector, located in Asti, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In October 2004, the Agencia Nacional de Energia Electrica (ANEEL –Brazil’s energy regulatory agency) awarded a 30 year contract to build, operate and maintain an 811 km transmission line of 500 kV and two power substations between Cuiaba in Mato Grasso and Intumbiara in Minas Gerais to the Spanish firm Elecnor. Elecnor won the bid in an auction in September 2004 by offering 40% below the maximum annual revenues. It offered to pay US$59.3 million (164.6 million real) to the Brazilian government for the concession. In December 2006, BNDES, the Brazilian development bank, financed US $224 million for the construction, operation and maintenance of the transmission line. Total investment requirements were estimated at US$361 million (788 million real). Indirect financing was provided by three different groups of private banks (Banco Bradesco SA, Banco Votorantim SA, Banco Santander Brasil SA and Banco BNP Paribas Brasil SA). At this time, BNDES also financed #4352 Vila Do Conde Transmissora de Energia Transmission Line and #4353 Porto Primavera - Dourados – Imbirissu. MIGA also issued guarantees of $35.4 million to Cobra Instalaciones y Servicios SA. (Cobra) of Spain to cover its $39.2 million equity. The coverage is for fifteen years against the risk of breach of contract, and up to 10 years against the risk of transfer restriction. In March 2010, the shareholding structure was again modified when a Chinese state – owned company, SGID, acquired Itumbiara Transmissora de Energia and other transmission projects from Plena Transmissora de Energia (Isolux, 33,3%; Elecnor, 33,3%; Cobra Instalaciones y Servicios, 33,3%), which held 100% of the shares of the project company at the time the transaction took place. SGID invested US$ 1.72 billion (BRL 3.1 billion) in the acquisition of Plena Transmissora de Energia.

Original sector

Energy

Procurement method

Budget

Location

Country

Brazil

State

Asti

Source

Source reliability

High

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Commercial, Government, Power Generation (CCGT)

Article published date

2023-02-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project