ProjectClosed

CUKUROVA POWER IV

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

The proposed project consists of the construction and installation of about 300 km of transmission lines, sub-stations at Tarsus, Payas and Antakya, and completion of the Kadincik II project financed out of Loan 623-TU. The project also includes a training program for CEAS' personnel in modern techniques of electric systems engineering and operations and public utility financial planning. The Kadi

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Steel, Metal, Power Generation (CCGT), Government
Location
Turkey
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about CUKUROVA POWER IV

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “CUKUROVA POWER IV” is an infrastructure initiative in the Water Supply and Storage sector, located in Turkey. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed project consists of the construction and installation of about 300 km of transmission lines, sub-stations at Tarsus, Payas and Antakya, and completion of the Kadincik II project financed out of Loan 623-TU. The project also includes a training program for CEAS' personnel in modern techniques of electric systems engineering and operations and public utility financial planning. The Kadincik II project costs have exceeded the original estimates for two major reasons: (a) there were unexpected equipment price increases (e.g. quoted steel prices increased 70 percent in Europe in 1969); and (b) cost estimates for civil works were based on the Kadincik I contract prices which were subsequently exceeded. The total increase on the project costs is estimated at $3.7 million, of which $2.4 million in foreign exchange. The effect of this cost increase on the viability of the Kadincik II project will be largely offset by an increase in energy, now expected to be generated as a result of a greater availability of water than initially envisaged.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Turkey

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Steel, Metal, Power Generation (CCGT), Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project