Cul-De-Sac Extention Phase III
Sector: Power Transmission • Location: Dauberville, Pennsylvania, United States of America
Source: Dodge
The project includes demolition of a portion of the existing cul-de-sac bulb extension of the cul-de-sac with a new bulb, grading as necessary to construct the cul-de-sac (with replacement of topsoil and stabilization), adjustment of existing utilities, and coordination of topsoil stripping with the Owner.
- Status
- Closed
- Sector
- Power Transmission, Road, Commercial, Government, Power Generation (CCGT)
- Location
- Dauberville, Pennsylvania, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Cul-De-Sac Extention Phase III
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes demolition of a portion of the existing cul-de-sac bulb extension of the cul-de-sac with a new bulb, grading as necessary to construct the cul-de-sac (with replacement of topsoil and stabilization), adjustment of existing utilities, and coordination of topsoil stripping with the Owner. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Pennsylvania |
City | Dauberville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Transmission, Road, Commercial, Government, Power Generation (CCGT) |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Transmission projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- North Creek Trail Section 4-Phase 2 & 3
- Fine Arts and Housing Cooling Engineering Study
