logo

Culinary Well Drilling

Sector: Water Supply and Storage • Location: Holden, Utah, United States of America

Source: Dodge USA

Project
Bidding

The Project includes the following work: Phase 1: Drill, log, test pump, and sample an 8 diameter test well to a minimum depth of approximately 600 feet. Phase 2: If the test well proves to be successful, construct a 20 diameter culinary well with a 601 deep borehole and a 12 diameter casing & screen with filter pack, check alignment, install casing, sanitary seal, develop & perform pumping tests,

Status
Prospective
Sector
Water Supply and Storage, Government, Waste Processing and Treatment, Commercial
Location
Holden, Utah, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Culinary Well Drilling

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Culinary Well Drilling” is an infrastructure initiative in the Water Supply and Storage sector, located in Holden, Utah, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project includes the following work: Phase 1: Drill, log, test pump, and sample an 8 diameter test well to a minimum depth of approximately 600 feet. Phase 2: If the test well proves to be successful, construct a 20 diameter culinary well with a 601 deep borehole and a 12 diameter casing & screen with filter pack, check alignment, install casing, sanitary seal, develop & perform pumping tests, install temporary welded casing seal cap, clean up the site, and remove equipment and materials

Procurement method

Budget

Location

Country

United States of America (USA)

State

Utah

City

Holden

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Waste Processing and Treatment, Commercial

Article published date

2024-09-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project