Cullerin Range Wind Farm
Source: Power Technology
Cullerin Range wind farm is located 30km from Goulburn in southern New South Wales NSW Australia The 30MW wind farm can generate electricity that is sufficient to power 15000 homes Origin Energy is the owner and operator of the wind farm The wind farm was built with an investment of 797m and became fully operational in July 2009 It has a capacity factor of 44 The wind farm was originally proposed
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Cullerin Range wind farm is located 30km from Goulburn in southern New South Wales NSW Australia The 30MW wind farm can generate electricity that is sufficient to power 15000 homes Origin Energy is the owner and operator of the wind farm The wind farm was built with an investment of 797m and became fully operational in July 2009 It has a capacity factor of 44 The wind farm was originally proposed by EPURON a leading developer and financer of wind projects The proposal was approved by the NSW Department of Planning in February 2007 EPURON sold the development rights of the project to Origin Energy in 2008 Cullerin Range is Origin Energys first owned and operated wind farm It is an important part of Origin Energys strategy for energy generation in the future The wind farm is also the first significant project to commence operations in NSW It helps in lowering NSWs greenhouse gas emissions by avoiding 100000t of carbon annually The wind farm is located on the Cullerin Range which rises 100m above the nearby areas It runs along the Great Dividing Range The wind farm occupies an area of 45ha and consists of 15 wind turbines rated at 2MW each The turbines are located along a 35km segment of the range Each turbine features three blades which are 46m long with an upwind design The nacelle includes the generator gearbox and control gear The nacelles are equipped with sensors to identify wind speed and direction The turbines have been erected on 80m high towers and anchored to the ground with reinforced concrete footings The towers were assembled in three sections at the site The turbine towers and foundations feature an earthing design that protects the turbines from lightning strikes Total height of the turbines is about 126m The wind farm can shut itself down if required Each turbine is connected to a substation located on site through underground cabling The turbines have a design life of 20 to 30 years after which they will be removed or recommissioned Construction of the wind farm began in 2008 and by February 2009 civil works were completed The construction activities had to be carried out in cold climatic conditions The site included steep access and rocky terrain which required additional planning and posed challenges to construction Equipment used in the site work included a D9 Dozer 30t excavators Vermeer Rocksaw and crusher units Offroad dump trucks offroad water carts compactors and graders were also used Commissioning of the wind farm was carried out between May and early July 2009 More than 100 people were involved in the construction Electricity generated by the wind farm is exported to the 132kV Goulburn to Yass distribution line The line passes through the northern part of the site and is operated by Country Energy in which Origin Energy owns 514 interest CATCON and Areva TD were responsible for the design and construction of the concrete bases of the turbines and installation of the cable network They were also responsible for constructing the road and hardstand network civil works for the substation and overall site management REpower supplied the wind turbines for the project It supplied eight MM82 model turbines and seven MM92 model turbines REpower is also responsible for servicing the turbines It subcontracted Keppel Prince to fabricate sections for 15 wind towers for the wind farm Hill Michael provided the strategic technical design for the project SKM Consulting provided project management and technical services for the project iTEC supplied 13222kV relay panels and a SCADA panel for the wind farm The NSW region has a huge potential for wind power due to its geography About 13 wind farms are operating in the region generating about 1018MW of power In 20092010 18 of the regions energy demand was met by wind power The government has formulated favourable policies to encourage further investment in renewable energy in the region Several new wind farms also under construction in the region Get industry leading news data and analysis delivered to your inbox |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
