Cultural Centers of Lincoln New Center
Sub bidding, construction documents · Nebraska · Last reported Feb 2025
Source: Dodge
The project is an approximately 62,000 SF new 2 story building. The main roof and wall structures of the entire building will be PEMB construction with the 2nd Floor structure inside of the building constructed with traditional steel post and beam floor structure
- Status
- Closed
- Sector
- Metal, Government, Commercial, Manufacturing (Industrial), Steel
- Location
- Lincoln, Nebraska, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Cultural Centers of Lincoln New Center
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Sub Bidding, Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is an approximately 62,000 SF new 2 story building. The main roof and wall structures of the entire building will be PEMB construction with the 2nd Floor structure inside of the building constructed with traditional steel post and beam floor structure |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nebraska |
City | Lincoln |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Metal, Government, Commercial, Manufacturing (Industrial), Steel |
Article published date | 2025-02-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- Shivwits Band of Paiutes Fiber Ring Connectivity Project
- PARTIAL METAL BEAM REPLACEMENT DUE TO FIRE DAMAGE, ROOF REPLACEMENT WORK DUE TO FIRE DAMAGE
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- TO CONSTRUCT 15,000 SF PRE-FAB METAL BUILDING AND ASSOCIATED SITE IMPROVEMENTS (1069 & 1089 INDUSTRIAL)
- Willard InterContinental Hotel
- Pacific Visions Wing at the Aquarium of the Pacific
