logo
ProjectClosed

Culvert 209 Replacement

One of 10,000+ projects Taiyo tracks in Ontario.

Source: Dodge

The Scope of Work associated with this RFT involves the replacement of theexisting corrugated steel pipe arch (CSPA) structure in its entirety, with a newprecast concrete box culvert. No full road closure is permitted, andconstruction / traffic control shall be staged. The work shall also includeapproximately 110m of associated roadworks and roadside safetyimprovements. The structure is located on

Status
Closed
Sector
Waste Processing and Treatment, Water Supply and Storage, Road, Steel, Car parking, Cement, Automotive, Commercial, Government, Metal
Location
King City, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Culvert 209 Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Culvert 209 Replacement” is an infrastructure initiative in the Waste Processing and Treatment sector, located in King City, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Scope of Work associated with this RFT involves the replacement of theexisting corrugated steel pipe arch (CSPA) structure in its entirety, with a newprecast concrete box culvert. No full road closure is permitted, andconstruction / traffic control shall be staged. The work shall also includeapproximately 110m of associated roadworks and roadside safetyimprovements. The structure is located on 8th Concession, approximately 240m south of King Road, in the Township of King

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

King City

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Water Supply and Storage, Road, Steel, Car parking, Cement, Automotive, Commercial, Government, Metal

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project