Culvert Bridge Replacement Bridge File 73575
Closed · Alberta · Last reported Jul 2025
Source: Dodge
The County requires a qualified Supplier to perform the removal of the existing culverts and installation of a new culvert structure at Pointe-Aux-Pins Creek SW-13-53-22-W4M Bridge File #73575.
- Status
- Closed
- Sector
- Bridge, Water Supply and Storage, Road, Waste Processing and Treatment, Commercial, Government
- Location
- Fort Saskatchewan, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Culvert Bridge Replacement Bridge File 73575
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The County requires a qualified Supplier to perform the removal of the existing culverts and installation of a new culvert structure at Pointe-Aux-Pins Creek SW-13-53-22-W4M Bridge File #73575. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Fort Saskatchewan |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Bridge, Water Supply and Storage, Road, Waste Processing and Treatment, Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in Canada
- Aqsarniit Hotel and Convention Centre
- Toronto Airport Piers D and E Fixed Bridges
- British Columbia Swartz Bay and Tsawwassen Ferry Terminals
- Viva Magnetics Plant
- Sheffield Bridge Tri-Municipal Project
- Nisichawayasihk Cree Nation (NCN) Road Paving Project Phase 2
- Rosenort Industrial Park Road Extension
- Paving of Oak River Roads
