logo
ProjectClosed

Culvert Construction BF 01780

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The Work is generally comprised of: - Dust abatement and traffic accommodation for culvert construction; - Total suspended solids (TSS) testing; - Fish capture and release; - Remove and dispose of the existing single-span bridge; - Structural and channel excavation; - Backfill; - Construction of new single 3.0 m diameter, 27.0 m long CSP, and Associated Work; - Heavy rock riprap and rock cluster p

Status
Closed
Sector
Commercial, Water Supply and Storage, Bridge, Car parking, Waste Processing and Treatment, Government, Road, Automotive
Location
Red Deer, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Culvert Construction BF 01780

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Culvert Construction BF 01780” is an infrastructure initiative in the Commercial sector, located in Red Deer, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work is generally comprised of: - Dust abatement and traffic accommodation for culvert construction; - Total suspended solids (TSS) testing; - Fish capture and release; - Remove and dispose of the existing single-span bridge; - Structural and channel excavation; - Backfill; - Construction of new single 3.0 m diameter, 27.0 m long CSP, and Associated Work; - Heavy rock riprap and rock cluster placement Class 1; - Water and environmental management; - Installation and maintenance of tempora...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Red Deer

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Bridge, Car parking, Waste Processing and Treatment, Government, Road, Automotive

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project