logo
ProjectClosed

Culvert Construction BF 02171 - Range Road 282

Sector: Water Supply and Storage • Location: Red Deer County, Alberta, Canada

Source: Dodge USA

The Work is generally comprised of: - Traffic accommodation for bridge construction; - Total suspended solids (TSS) testing; - Fish capture and release; - Remove and dispose of existing guardrail and bridge; - Structural and channel excavation; - Backfill; - Wastewater line protection Rigid foam insulation and biaxial geogrid; - Construction of new single 2.7 m diameter, 22 m long CSP culvert and

Status
Closed
Sector
Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Mass Transit, Rail, Commercial
Location
Red Deer County, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Culvert Construction BF 02171 - Range Road 282

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Culvert Construction BF 02171 - Range Road 282” is an infrastructure initiative in the Water Supply and Storage sector, located in Red Deer County, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work is generally comprised of: - Traffic accommodation for bridge construction; - Total suspended solids (TSS) testing; - Fish capture and release; - Remove and dispose of existing guardrail and bridge; - Structural and channel excavation; - Backfill; - Wastewater line protection Rigid foam insulation and biaxial geogrid; - Construction of new single 2.7 m diameter, 22 m long CSP culvert and associated work; - Heavy rock riprap Class 1; - Care of water and environmental management; and, ...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Red Deer County

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Road, Waste Processing and Treatment, Mass Transit, Rail, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project