Culvert Maintenance Project
Sector: Chemical (Industrial) • Location: Hortonville, Wisconsin, United States of America
Source: Dodge USA
Culvert maintenance by slip-lining each of the three culverts. The culvert lining used should be a high-density polyethylene HDPE or equivalent material and span the entire length of each culvert. Liners should be securely fastened to the existing culverts on both ends and then any void area between the lining and the culvert shall be filled with concrete or polyurethane material. Sediment Basin E
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Culvert maintenance by slip-lining each of the three culverts. The culvert lining used should be a high-density polyethylene HDPE or equivalent material and span the entire length of each culvert. Liners should be securely fastened to the existing culverts on both ends and then any void area between the lining and the culvert shall be filled with concrete or polyurethane material. Sediment Basin Excavation/Clean-Out A sediment basin exists directly in front of the upstream side of the culverts. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Chemical (Industrial) projects in United States of America
- 2006 Greenhouse Gas Emissions Audit at Cal Poly Humboldt
- William Pond Chemical Toilet Replacement
- REMOVE 3 (E) CHEMICAL REAGENT TANKS & ASSOCIATED CHEMICAL PUMPS.INSTALL 3(N) REPLACMENT CHEMICAL REAGENT TANKS,SEE TXT
- I-16 @ 5 LOCS & I-95 @ 1 LOCS - BRIDGE PRESERVATION
- I-75 @ 4 LOCS IN COBB & FULTON COUNTY - BRIDGE PRESERVATION
- BRIDGE PRESERVATION @ 7 LOCS IN COWETA; FAYETTE & TROUP
- Grand Mound Wastewater Treatment Plant Second Oxidation Ditch
- Diet-Induced Changes in Inflammation as Determinants of Colon Cancer (R01)
