Culvert Pipe Replacement - Units 50
Sector: Water Supply and Storage • Location: Palm Bay, Florida, United States of America
Source: Dodge USA
This project consists of the removal, disposal, furnishing, surveying, installation and restoration of street crossing drainage pipes located in the City of Palm Bay s Port Malabar Unit 50. The project shall include all incidentals required to complete the project such as utility coordination, relocations, material furnishings, erosion control, dewatering, maintenance of traffic, surveying, remova
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Seaport, Waste Processing and Treatment, Road, Government, Commercial, Power Generation (CCGT)
- Location
- Palm Bay, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Culvert Pipe Replacement - Units 50
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the removal, disposal, furnishing, surveying, installation and restoration of street crossing drainage pipes located in the City of Palm Bay s Port Malabar Unit 50. The project shall include all incidentals required to complete the project such as utility coordination, relocations, material furnishings, erosion control, dewatering, maintenance of traffic, surveying, removal and disposal of old headwalls/culverts/etc., installations new culverts, testing and restoratio... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Palm Bay |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Seaport, Waste Processing and Treatment, Road, Government, Commercial, Power Generation (CCGT) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
