CULVERT REHAB: ORANGE, ROCK, WEST COUNTIES
Sector: Waste Processing and Treatment • Location: New York, United States of America
Source: New York State Department of Transportation (NYSDOT)
This project will rehabilitate eight culverts in Orange, Rockland and Westchester counties. The rehabilitations will occur on two culverts that carry the Midland Avenue (982B) over drainage systems, one carrying NY 303 over an Unknown Stream, one carrying NY 134 over an Unknown Stream, two that carry the Taconic State Parkway over Davis Brook and an Unknown Stream, and two culverts that carry NY 1
- Status
- Under Construction
- Sector
- Waste Processing and Treatment, Road, Government
- Location
- New York, United States of America
- Updated
- 22 Jul 2026
- Source
- New York State Department of Transportation (NYSDOT)
ConstructChat
Ask ConstructChat about CULVERT REHAB: ORANGE, ROCK, WEST COUNTIES
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | in development |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project will rehabilitate eight culverts in Orange, Rockland and Westchester counties. The rehabilitations will occur on two culverts that carry the Midland Avenue (982B) over drainage systems, one carrying NY 303 over an Unknown Stream, one carrying NY 134 over an Unknown Stream, two that carry the Taconic State Parkway over Davis Brook and an Unknown Stream, and two culverts that carry NY 17 over Wee Wah and an Unknown Stream. Work will take place in various municipalities throughout Orange, Rockland, and Westchester Counties. |
Location
Country | United States of America (USA) |
State | New York |
Source
Source | New York State Department of Transportation (NYSDOT) |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Road, Government |
Article published date | 2026-01-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
