Culvert Repair/Replacements 5 Sites
One of 10,000+ projects Taiyo tracks in Georgia.
Source: Dodge USA
- Remove and dispose of debris 2. Excavate culverts 3. Reinstall existing 2 parallel drainage structures; one 24-inch CMP of 30 linear foot and one 32-inch CMP of 30 linear foot with an estimated excavation of 41 cubic yards. 4. Backfill with dirt. Compact driving surface. Locations : Attaway Road , Jack Scott Road , County Line Road , Oaky Grove Ch Road , Hightower Road
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government
- Location
- Wrightsville, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Culvert Repair/Replacements 5 Sites
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 1. Remove and dispose of debris 2. Excavate culverts 3. Reinstall existing 2 parallel drainage structures; one 24-inch CMP of 30 linear foot and one 32-inch CMP of 30 linear foot with an estimated excavation of 41 cubic yards. 4. Backfill with dirt. Compact driving surface. Locations : Attaway Road , Jack Scott Road , County Line Road , Oaky Grove Ch Road , Hightower Road |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Wrightsville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
