Culvert Replacement -Weasel Brook Section 7
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Demolition and removal of the approximate 640 linear feet of existing 132 x 90 CMP culvert and concrete head wall, apron and structures conveying Weasel Brook and replacement with new 72 x 113 reinforced concrete elliptical pipe, concrete head wall and concrete apron in itsplace
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial
- Location
- Clifton, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Culvert Replacement -Weasel Brook Section 7
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Demolition and removal of the approximate 640 linear feet of existing 132 x 90 CMP culvert and concrete head wall, apron and structures conveying Weasel Brook and replacement with new 72 x 113 reinforced concrete elliptical pipe, concrete head wall and concrete apron in itsplace |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Clifton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
