logo
ProjectClosed

Culvert Replacement and Other Work

Sector: Bridge • Location: Sherwood Park, Alberta, Canada

Source: Dodge

Work at this site includes the removal and disposal of both existing 1429 mm x 1575 mm SPCSP culvert with a 47.5 m invert length and 900 mm CSP culvert with a 47.7 m invert length and the installation of a new 2900 mm diameter CSP culvert with a 51 m invert length. The crossing is located on 41st Avenue over an unnamed watercourse, in Whitecourt. Traffic Accommodation Demolition and Disposal of Br

Status
Closed
Sector
Bridge, Water Supply and Storage, Road, Waste Processing and Treatment, Car parking, Automotive, Commercial, Government
Location
Sherwood Park, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Culvert Replacement and Other Work

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Culvert Replacement and Other Work” is an infrastructure initiative in the Bridge sector, located in Sherwood Park, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work at this site includes the removal and disposal of both existing 1429 mm x 1575 mm SPCSP culvert with a 47.5 m invert length and 900 mm CSP culvert with a 47.7 m invert length and the installation of a new 2900 mm diameter CSP culvert with a 51 m invert length. The crossing is located on 41st Avenue over an unnamed watercourse, in Whitecourt. Traffic Accommodation Demolition and Disposal of Bridge Structure TSS Testing Excavation CSP with Couplers Supply CSP Assembly Substrate Holders Sup...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Sherwood Park

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Bridge, Water Supply and Storage, Road, Waste Processing and Treatment, Car parking, Automotive, Commercial, Government

Article published date

2025-07-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project