Culvert Replacement and Other Work
Bid results · Alberta · Last reported Mar 2024
Source: Dodge USA
Work at this site includes the removal and disposal of the existing 1200 mm and 100 mm CSP culvert with approximately 17.0 m invert lengths and the installation of a new 2700 mm diameter CSP culvert with a 29.0 m invert length. The crossing is located on Township Road 683 over a Tributary to the Athabasca River, 21 km northwest of Grassland. Traffic Accommodation Demolition and Disposal of Bridge
- Status
- Closed
- Sector
- Commercial, Bridge, Water Supply and Storage, Waste Processing and Treatment, Cement, Road, Government, Car parking, Automotive
- Location
- Sherwood Park, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Culvert Replacement and Other Work
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work at this site includes the removal and disposal of the existing 1200 mm and 100 mm CSP culvert with approximately 17.0 m invert lengths and the installation of a new 2700 mm diameter CSP culvert with a 29.0 m invert length. The crossing is located on Township Road 683 over a Tributary to the Athabasca River, 21 km northwest of Grassland. Traffic Accommodation Demolition and Disposal of Bridge Structure Excavation Water Management CSP with Couplers Supply CSP Assembly Backfill Concrete End... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Sherwood Park |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Water Supply and Storage, Waste Processing and Treatment, Cement, Road, Government, Car parking, Automotive |
Article published date | 2024-08-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
