Culvert Replacement and Other Work
One of 10,000+ projects Taiyo tracks in Alberta.
Source: Dodge USA
Bridge File 01019 (SE 03-46-15-W4M) located 19 km northeast of Daysland on Township Road 460. Work includes the removal the existing 6.1 m HC girder bridge on a treated timber substructure and replacement with a new 2200 mm diameter x 29 m invert length CSP culvert. Work at this site includes the removal and disposal of the existing single span 6.1 m HC girder bridge on a treated timber substructu
- Status
- Under Construction
- Sector
- Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Bridge, Forest Products and Packaging, Government
- Location
- Daysland, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Culvert Replacement and Other Work
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Bridge File 01019 (SE 03-46-15-W4M) located 19 km northeast of Daysland on Township Road 460. Work includes the removal the existing 6.1 m HC girder bridge on a treated timber substructure and replacement with a new 2200 mm diameter x 29 m invert length CSP culvert. Work at this site includes the removal and disposal of the existing single span 6.1 m HC girder bridge on a treated timber substructure and the installation of a new 2200 mm CSP culvert with a 29.0 m invert length. The crossing is... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Daysland |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Bridge, Forest Products and Packaging, Government |
Article published date | 2024-07-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Canada
- Site C Worker Accommodation
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Thornwood Residences Phase 2
- Canadian Tire Corporate Office Interior Renovation
- St. Stephen Border Crossing
- Aqsarniit Hotel and Convention Centre
- Safeway Refrigerated Warehouse
- International Brotherhood of Boilermakers Training Centre and Union Hall
