logo
ProjectClosed

Culvert Replacement and Other Work

Sector: Water Supply and Storage • Location: Valleyview, Alberta, Canada

Source: Dodge

Work at this site includes the removal and disposal of the existing 2134 mm diameter CSP culvert with a 28.3 m invert length and the installation of a new 2700 mm diameter CSP culvert with a 26 m invert length. The crossing is located on a local road over an unnamed watercourse, 38 km northwest of Valleyview. The Scope of Work at this site shall include the following: Traffic Accommodation Demolit

Status
Closed
Sector
Water Supply and Storage, Government, Commercial, Bridge, Waste Processing and Treatment, Road
Location
Valleyview, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Culvert Replacement and Other Work

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Culvert Replacement and Other Work” is an infrastructure initiative in the Water Supply and Storage sector, located in Valleyview, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Work at this site includes the removal and disposal of the existing 2134 mm diameter CSP culvert with a 28.3 m invert length and the installation of a new 2700 mm diameter CSP culvert with a 26 m invert length. The crossing is located on a local road over an unnamed watercourse, 38 km northwest of Valleyview. The Scope of Work at this site shall include the following: Traffic Accommodation Demolition and Disposal of Bridge Structure Excavation Water Management CSP with Couplers Supply CSP Ass...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Valleyview

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Commercial, Bridge, Waste Processing and Treatment, Road

Article published date

2025-03-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project