Culvert Replacement and Other Work
Closed · Alberta · Last reported Apr 2024
Source: Dodge USA
Work at this site includes the removal and disposal of the existing 3048 mm SPCSP culvert with a 35.4 m invert length and the installation of a new 3990 mm diameter SPCSP culvert with a 41.45 m invert length. The crossing is located on a local road over an unnamed tributary to Grande Prairie Creek, 15 km northwest of Sexsmith.
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial
- Location
- Sexsmith, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Culvert Replacement and Other Work
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work at this site includes the removal and disposal of the existing 3048 mm SPCSP culvert with a 35.4 m invert length and the installation of a new 3990 mm diameter SPCSP culvert with a 41.45 m invert length. The crossing is located on a local road over an unnamed tributary to Grande Prairie Creek, 15 km northwest of Sexsmith. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Sexsmith |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
