logo
ProjectClosed

Culvert Replacement At Armstrong

One of 10,000+ projects Taiyo tracks in Manitoba.

Source: Dodge

The work will require removing the existing 3 x 1000mm CSP 13 to 14m long and installing four (4) new 2000mm x 20.7m long CSP with concrete headwall on Rd 12E, SE 36-18-02 E1 at Bass Drain in the Rural Municipality of Armstrong.

Status
Closed
Sector
Cement, Government, Waste Processing and Treatment, Commercial, Water Supply and Storage
Location
Winnipeg, Manitoba, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Culvert Replacement At Armstrong

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Culvert Replacement At Armstrong” is an infrastructure initiative in the Cement sector, located in Winnipeg, Manitoba, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work will require removing the existing 3 x 1000mm CSP 13 to 14m long and installing four (4) new 2000mm x 20.7m long CSP with concrete headwall on Rd 12E, SE 36-18-02 E1 at Bass Drain in the Rural Municipality of Armstrong.

Procurement method

Budget

Location

Country

Canada

State

Manitoba

City

Winnipeg

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Government, Waste Processing and Treatment, Commercial, Water Supply and Storage

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project