logo

Culvert Replacement at Pilot Creek

Sector: Steel • Location: Winnipeg, Manitoba, Canada

Source: Dodge USA

Project
Bidding

Remove existing 2-barrel corrugated steel pipe culverts and install three (3) corrugated steel pipe culverts with reinforced concrete headwalls on PR 440, located in the South East of SEC. 26-03-12W, Municipality of Louise, Bridge Site No. 1206-10.

Status
Prospective
Sector
Steel, Government, Cement, Waste Processing and Treatment, Water Supply and Storage, Bridge, Metal, Commercial
Location
Winnipeg, Manitoba, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Culvert Replacement at Pilot Creek

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Culvert Replacement at Pilot Creek” is an infrastructure initiative in the Steel sector, located in Winnipeg, Manitoba, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

bidding

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Remove existing 2-barrel corrugated steel pipe culverts and install three (3) corrugated steel pipe culverts with reinforced concrete headwalls on PR 440, located in the South East of SEC. 26-03-12W, Municipality of Louise, Bridge Site No. 1206-10.

Procurement method

Budget

Location

Country

Canada

State

Manitoba

City

Winnipeg

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Steel, Government, Cement, Waste Processing and Treatment, Water Supply and Storage, Bridge, Metal, Commercial

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project