logo
ProjectClosed

Culvert Replacement Jacking Concrete Culverts

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

SECTION I PTH 12 Culvert Replacement (1.2km North of Buffalo Point Road) (Project ID No. C07318) Supply and install one (1) precast concrete culvert by jacking through Provincial Trunk Highway 12, 1.2km north of Buffalo Point Road, in the Rural Municipality of Piney. SECTION II Buffalo Point Road Culvert Replacement (5.4km East of PTH 12) (Project ID No. C07332) Supply and install one (1) precast

Status
Closed
Sector
Cement, Steel, Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Metal
Location
Winnipeg, Manitoba, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Culvert Replacement Jacking Concrete Culverts

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Culvert Replacement Jacking Concrete Culverts” is an infrastructure initiative in the Cement sector, located in Winnipeg, Manitoba, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SECTION I PTH 12 Culvert Replacement (1.2km North of Buffalo Point Road) (Project ID No. C07318) Supply and install one (1) precast concrete culvert by jacking through Provincial Trunk Highway 12, 1.2km north of Buffalo Point Road, in the Rural Municipality of Piney. SECTION II Buffalo Point Road Culvert Replacement (5.4km East of PTH 12) (Project ID No. C07332) Supply and install one (1) precast concrete culvert by trenching, including removing the existing corrugated steel culvert, through ...

Procurement method

Budget

Location

Country

Canada

State

Manitoba

City

Winnipeg

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Steel, Government, Road, Waste Processing and Treatment, Commercial, Water Supply and Storage, Metal

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project