Culvert Replacement Phase 2 REBID
Sector: Commercial • Location: Paola, Kansas, United States of America
Source: Dodge USA
This PROJECT consists of 3 separate work sites with each involving the removal and replacement of existing span structure culverts. Each existing structure is 10-14 in length with two being concrete slabs and the other being a steel beam span with concrete deck. The proposed structures include 2-18 reinforced concrete spans and a 16 x6 RFB that is skewed 30 degrees. Specific work items are removal
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Cement, Steel, Waste Processing and Treatment, Government, Metal
- Location
- Paola, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Culvert Replacement Phase 2 REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This PROJECT consists of 3 separate work sites with each involving the removal and replacement of existing span structure culverts. Each existing structure is 10-14 in length with two being concrete slabs and the other being a steel beam span with concrete deck. The proposed structures include 2-18 reinforced concrete spans and a 16 x6 RFB that is skewed 30 degrees. Specific work items are removal of existing structures, dirt/rock excavation, grading, hauling, compaction of earthwork, reinfor... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Paola |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Cement, Steel, Waste Processing and Treatment, Government, Metal |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America
- SR 3/US 19 FROM 0.14 MI S OF SR 7 TO HENRY COUNTY LINE
- SR 150 FROM 0.18 MI S OF CR 14/STERLING WELLS ROAD TO SR 47
- SR 61 FM PAULDING COUNTY LINE TO N OF CR 522/OLD ALABAMA RD
- COMMERCIAL DRIVE IN STATHAM
- SR 21 FROM 0.02 MI S OF SR 30 TO 0.24 MI S OF NS 916917C
- SR 155 FROM JONESBORO ROAD TO DEKALB COUNTY LINE
- SR 400 @ CR 9284/WINDWARD PKWY
- SR 49 FROM BIBB COUNTY LINE TO BALDWIN COUNTY LINE
