Culvert Replacement
One of 9,699 projects Taiyo tracks in Montana.
Source: Dodge
The project consists of the removal and replacement of an existing culvert at Patricia Lane and at Wingate Lane (work within the Big Ditch), as well as installation of an unloader system for the City High Ditch at Country Club Circle
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Road, Government
- Location
- Billings, Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Culvert Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of the removal and replacement of an existing culvert at Patricia Lane and at Wingate Lane (work within the Big Ditch), as well as installation of an unloader system for the City High Ditch at Country Club Circle |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
City | Billings |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Road, Government |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
