logo
ProjectClosed

Culvert Replacements PTH 10

Sector: Water Supply and Storage • Location: Winnipeg, Manitoba, Canada

Source: Dodge USA

Installation of two (2) corrugated steel culverts at two (2) sites including frost tapers, on Provincial Trunk Highway 10, at Kilometre 1.5 and Kilometre 7.2 North of Cranberry Portage (PA 612), in Unorganized Electoral Division of Flin Flon.

Status
Closed
Sector
Water Supply and Storage, Road, Steel, Waste Processing and Treatment, Metal, Commercial
Location
Winnipeg, Manitoba, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Culvert Replacements PTH 10

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Culvert Replacements PTH 10” is an infrastructure initiative in the Water Supply and Storage sector, located in Winnipeg, Manitoba, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Installation of two (2) corrugated steel culverts at two (2) sites including frost tapers, on Provincial Trunk Highway 10, at Kilometre 1.5 and Kilometre 7.2 North of Cranberry Portage (PA 612), in Unorganized Electoral Division of Flin Flon.

Procurement method

Budget

Location

Country

Canada

State

Manitoba

City

Winnipeg

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Steel, Waste Processing and Treatment, Metal, Commercial

Article published date

2024-02-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project