logo

Cumberland - Reconstruction of Dam #2

Sector: Water Supply and Storage • Location: British Columbia, Canada

Source: Infrastructure Canada

Project
Pre-Construction

The project will mitigate a potential disaster by rehabilitating an aging dam used for the Village of Cumberland’s drinking water supply. The dam is currently unsafe, unstable and does not meet dam safety regulatory requirements. Failure of the dam would disrupt water supply in Cumberland and also create significant turbidity in Comox Lake resulting in boil water advisory. In 2015 the Village was

Project Information FAQ

Project Information

3 Q
The project “Cumberland - Reconstruction of Dam 2” is an infrastructure initiative in the Water Supply and Storage sector, located in British Columbia, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pre-construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will mitigate a potential disaster by rehabilitating an aging dam used for the Village of Cumberland’s drinking water supply. The dam is currently unsafe, unstable and does not meet dam safety regulatory requirements. Failure of the dam would disrupt water supply in Cumberland and also create significant turbidity in Comox Lake resulting in boil water advisory. In 2015 the Village was provided a Hazard Abatement Order from the Medical Health Officer regarding mitigation of sediment being generated by flows discharging via Perseverance Creek North Branch due to erosion. The project works include: - Reconstruction of Dam #2 including rock fill embankment and central sheet-pile cut-off wall; - Installation of tie in to the Cumberland Creek spillway; - Construction of a service spillway and flow regulation of Cumberland Creek; - Reconstruction of a rock fill saddle dam with a sheet pile core wall on Perseverance Creek North Branch; - Installation of an outlet port at the Lower Level Outlet on Dam #2; - Installation of a second outlet port at the Lower Level Outlet on Dam #2, for hydro generation; - Construction of approximately 2-3 m berm and associated blasting upgrades at Henderson Lake for erosion control; - Improvement of spillway and raised crest level on the existing dam to improve discharge capacity; and, - All related works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data