Curb and Gutter Remove and Replace
Sector: Power Generation (CCGT) • Location: La Vale, Maryland, United States of America
Source: Dodge USA
Scope of Work Mobilize/Demobilize Excavate shoulder 5 from edge of existing pavement Sawcut and remove existing curb & gutter Adjust existing electrical hand box. The existing frame and cover shall be anchored to box after adjustment is complete. Frame and cover shall match existing adjacent pavement finished grade. Place 12 of Graded Aggregate Base Install Standard Type A Combination Curb & Gutte
- Status
- Closed
- Sector
- Power Generation (CCGT), Road, Commercial, Manufacturing (Industrial)
- Location
- La Vale, Maryland, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Curb and Gutter Remove and Replace
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Scope of Work Mobilize/Demobilize Excavate shoulder 5 from edge of existing pavement Sawcut and remove existing curb & gutter Adjust existing electrical hand box. The existing frame and cover shall be anchored to box after adjustment is complete. Frame and cover shall match existing adjacent pavement finished grade. Place 12 of Graded Aggregate Base Install Standard Type A Combination Curb & Gutter 12 Gutter Pan 8 Depth Place common borrow/topsoil as needed behind curb & gutter Turf grass Est... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maryland |
City | La Vale |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Commercial, Manufacturing (Industrial) |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
