Curb Cuts and Sidewalks Phase 5
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Thescope of the project is for repair and remediation of existing ADA ramps,sidewalks, curb cuts, curb, gutters, concrete slabs and detectable warnings atvarious locations within the public right of way throughout the City ofTrinidad, by removing existing non complaint items and generally bringing thesearea into compliance with the Americans with Disabilities Act 2010.Approximately 9 various corne
- Status
- Closed
- Sector
- Government, Cement, Commercial, Car parking, Automotive
- Location
- Trinidad, Colorado, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Curb Cuts and Sidewalks Phase 5
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Thescope of the project is for repair and remediation of existing ADA ramps,sidewalks, curb cuts, curb, gutters, concrete slabs and detectable warnings atvarious locations within the public right of way throughout the City ofTrinidad, by removing existing non complaint items and generally bringing thesearea into compliance with the Americans with Disabilities Act 2010.Approximately 9 various corners, located in 14 intersections |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Colorado |
City | Trinidad |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Cement, Commercial, Car parking, Automotive |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- KING STREET IN COHUTTA
- SR 120/ROSWELL RD@CR 4662/EAST COBB DR EXT LT TURN LANE
- DISTRICTWIDE PAVEMENT MARKING DIST 7
- EPHESUS CHURCH ROAD BR.& APPR.@ DOG RIVR(097-02278-00105E)
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- I-95 NB @ ST MARYS RIVER - BRIDGE REHAB
- SR 109 FROM ALABAMA STATE LINE TO SR 14/US 29
- SR 2 FM SR 15 IN CLAYTON TO SOUTH CAROLINA STATE LINE
